Contents and sources 1 sections

Key points

  • Zero plans a November 30 launch, with staked ZRO allocated to genesis validators.

Details

Four Pillars will operate a Zero validator node on behalf of Samsung Card. Zero plans to launch alongside LayerZero’s ATLAS trading infrastructure on November 30; staked ZRO is to be distributed equally among genesis validators by March 31, 2027.[1]

Sources & further reading

(1)

When checking a claim, compare the source date, measurement period and conditions. Some linked pages change over time.

  1. Four Pillars 將代表三星卡營運 Zero 驗證節點 (opens in a new tab)

For information and education, not investment advice. Crypto assets are volatile. Verify independently.

Found an error? Let us know ↗
Explore this section ↗